CB&Q E8 9937B         
Chicago Burlington & Quincy Railroad E8 9937B, westbound at Naperville on Illinois, April 28, 1965, photo by Chuck Zeiler. This is the Burlington's first E8, built December 1949 (c/n 9674), numbered just one suffix letter above the last E7, 9937A, built nine months earlier. It was delivered with silver (Aluminum) painted side panels, but was fitted with stainless steel panels during shopping. It became BN 9937 on March 2, 1970, and was retired May 28, 1975, sold for scrap to Precision Engineering Co. of Mt. Vernon, Illinois, later known as Precision National Corp..
Date: 4/28/1965 Location: Naperville, IL   Map Show Naperville on a rail map Views: 1200 Collection Of:   Chuck Zeiler
Locomotives: CBQ 9937B(E8A)    Author:  Chuck Zeiler
CB&Q E8 9937B
Picture Categories: Roster This picture is part of album:  CB&Q Passenger Diesels
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1202296