| The ballast regulator is heading back to the newly installed switch for this new section of track before sweeping down the track again. |
| Date:
6/25/2012 |
Location:
Griffith, IN Map  |
Views:
109 |
Collection Of:

Gary Everhart |
|
Author: Gary Everhart
|
 |
| Picture Categories: Roster,Track,Action |
This picture is part of album: CN to EJE Turnout Construction, Part 2 |