SWP Railroad Improvements (5)
Tamper-aligner checking the measurements of the rails at the end of the Greene Junction Bridge on the Southwest Pennsylvania Railroad in Wheeler Bottom, Dunbar Township, PA. Work is being done by Delta Railroad Contractors.
Date:
7/12/2015
Location:
Wheeler, PA
Views:
80
Collection Of:
Curt Beal
Author:
Curt Beal
Picture Categories: Bridge,Track,Action
This picture is part of album:
Southwest Pennsylvania Railroad- Track Upgrades
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=4329215