CN 2326 and CN 2529         
A CN container train parallels Harrison St. and passes Neenah Foundry Plant 2 & Plant 3 as it heads northeast via former SOO rails at Neenah, WI on 4 Jun '18. Plant 2 opened in 1960 and Plant 3 was built in 1967. Plant 1 opened in 1918 and stood about a mile to the north, until it was closed in 1994 and eventually demolished. A remnant of the former C&NW main line runs parallel on the far side of the train.
Date: 6/4/2018 Location: Neenah, WI   Map Show Neenah on a rail map Views: 131 Collection Of:   T. P. Bruss
Locomotives: CN 2326(ES44DC) CN 2529(C44-9W)    Author:  T. P. Bruss
CN 2326 and CN 2529
Picture Categories: This picture is part of album:  Northeast WI, Spring 2018
Share
User Comments
Name Type Comments Date
Mike Maskel General NICE SHOT 8/1/2018 9:47:42 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4996528