Day Of The Genesis Units         
All electric cars were kept in the yards on the day after the blizzard of 1/22/2005, and an emergency bi-hourly local service using only Genesis unts and Comet coaches was operated instead.
Date: 1/23/2005 Location: Fleetwood, NY   Map Show Fleetwood on a rail map Views: 746 Collection Of:   David Sommer
Locomotives: MNCR 213(P32AC-DM) MNCR 215(P32AC-DM)    Author:  David Sommer
Day Of The Genesis Units
Picture Categories: This picture is part of album:  Snowy Days At Metro-North
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=85450