After waiting for TWO AND A HALF HOURS, NS 267 with BNSF 761 leading finally arrived.
After waiting for TWO AND A HALF HOURS, NS 267 with BNSF 761 leading finally arrived.
After waiting for TWO AND A HALF HOURS, NS 267 with BNSF 761 leading finally arrived.
BNSF 761
2000s consist in 23
Westbound Coal Empties.
Westbound Coal Empties.
The second manifest, running rr east at this time, about to cross Hwy C!
U-MIISPI7-13A at Hoffman passing a waiting CP 197 and H-KCKNTW.
H-BRCNTW1
H BRCNTW
BNSF 761 W/B Military Train enters the Raton Yard while BNSF 788, 790 & BN 7261 await to go over Raton Pass
BNSF 761 heads west in the evening
BNSF 5208, UP 9809 & BNSF 761 done with their work and heading East.
BNSF 5208, UP 9809 & BNSF 761 rolling to a stop to do work in Fernley.
BNSF 5208, UP 9809 & BNSF 761 Eastbound at Thisbe siding.
Built August 1997.
K144 crosses the High Line at 1530.
BNSF 5418 is on K-144 at Guilderland Center, NY 5/2/2015
BNSF Gateway Sub
BNSF Gateway Sub
A CSX Leads An Oil Train
A CSX Leads An Oil Train
BNSF C44-9Ws are westbound as a LEM past the West Glacier Amtrak Station
Video still
A pair of Warbonnets lead a stacker west out of town.