East End of Erie Passing Siding.
East End of Erie Passing Siding.
East End of Erie Passing Siding.
East End of Erie Passing Siding.
From the far side, a UP led stacker appears.
UP 4327 - UP 4189 - UP 7140 trio on southbound double-stack duty charge across the Ridgefield Wildlife River-S unit entrance area under rainy skies (mixed with fog & snow flurries).
12t's crew begins their inspection as the 28n pulls east towards the 12t at Johnson In Binghamton, NY
Even though a sb could stop and do a simple car swap, UP takes all cars for RVSC and Harlingen an additional 20 miles to UP's Olmito yard. They are blocked and go back to Harlingen in a seperate run. Oh they're still running steam engine style so this yard transfer ran 20 mph the entire distance. When UP finished they tied these units down on the UP side of Harlingen yard.
Z ATLC-03 with UP 7479, 8133, 4327 & 4622. Though UP 4327 was not delivered in the Flag & Building America scheme, she sports one now.
Z ATLC-03 with UP 7479, 8133, 4327 & 4622. Though UP 4327 was not delivered in the Flag & Building America scheme, she sports one now.
UP's MPBEW-21 (Manifest Pine Bluff, AR-Englewood Yard Houston) is stopped on the main at the northend of Humble Siding on UP's Lufkin Sub.
2 NorthBound UP Trains Wait for Amtrak. The NS Powered train will depart first while the UP powered train waits for a fresh crew.
Northbound on the UP Mt Vernon Sub. Video from the day: http://youtu.be/uEMfPdHNxdE
CSX L144 heading north on an overcast day in Montgomery, Alabama
Union Pacific intermodal train Z-MXYC rumbles into downtown Crete, 30.5 miles south of Chicago.
Northbound at Lee Road 001. The chamber of commerce quality weather I had a luch sure has left town by now. Canon EOS-3, Ektachrome E100VS.
UP 4327
Lead Unlt of UP Manifest, UP South Yard
UP 4327
UP 4327
UP 4327
CSX Q126
A Southbound Manifest led by UP GM/EMD SD70M 4327 Rolls through the Main Street Grade Crossing in Duluth,GA in the Late Afternoon.
UP 1327
UP 4327
Heading into town.
Lead Unit on WB Containers