71LPX WB at Slaughterhouse Road
NS 8612 & 2698 work the yard as NS 955 arriving into the yard
NS 204 passes Kannapolis with veteren C39-8 8612 leading the way, trailing the consist is a C39-8E, not bad for a hotshot intermodel in this day and age
Southbound on the single as he passes the MP 299 Pennsy Signal. The bridge in the background is US Rts 22/322.
In the mix is one of the last NS C39-8s in operation # 8612
In the mix is one of the last NS C39-8s in operation # 8612
In the mix is one of the last NS C39-8s in operation # 8612
NS C40-9W #9481 & C39-8 #8612 lead a train North through Folkston
NS 34A is enterning Enola Yard with some ferry units for the Enola engine house.
NS 34A is waiting for the yard shifter to get out of the way so that they can yard their train.
The new roadbeg will be a temporary shod-fly around a new bridge under construction for the Pleasant Hill Road Grade crossing Elimination Project
NS Train #154 awaits in the distance
This C39-8 had a nose job.
An intermodal with five locomotives on it.
An aging warrior has had some recent front end repair and is now pulling second out on a Ga. Power Coal train.
Wreck damage on the 8612?
NS 337 rolls down the grade from Singleton Hill and into the eastside of Saint Matthews.