129 leads Pennsylvanian 43 west through the Gallitzin Tunnel.
Amtrak 43 passes on track 2 while 38G sits on the siding, as flurries begin to fall.
Amtrak 48 "Lake Shore Limited" is seen passing by the Great New York State Fair at 11:46AM. 52 axles.
p091-25
No. 4
Not long after #611 left, the eastbound Pennsylvanian screamed through behind P42DC #129.
Amtrak 42
Amtrak 42
Amtrak 43
On Sunday December 4, 2022 Amtrak 48 "Lake Shore Limited" had a Norfolk Southern leader. A computer failure on AMTK 129 somewhere around Elkhart, IN during the night and not only lost power but also the ability to control AMTK 111. Norfolk Southern provided a rescue locomotive which was doing most of the work with AMTK 111 providing head end power for the train.
On Sunday December 4, 2022 Amtrak 48 "Lake Shore Limited" had a Norfolk Southern leader. A computer failure on AMTK 129 somewhere around Elkhart, IN during the night and not only lost power but also the ability to control AMTK 111. Norfolk Southern provided a rescue locomotive which was doing most of the work with AMTK 111 providing head end power for the train. The train is seen passing through CP 293 on the CSX Syracuse Terminal Subdivision.
with a breakdown somewhere before Cleveland, this NS lead 48. A freight engine leading AMTK 48 hasnt happened in well over 7-8 years
8.3.2022 Mechums River, VA. Westbound Amtrak Cardinal #51 with 129 (P42DC B/D 11/2000, BN 52809) on the point passing milepost and signal 192.0.
Amtrak 29 bends away from the Maitland municipal complex at the head of a southbound Silver Meteor.
Amtrak 129 approaches the Winter Park depot at the head of a northbound Silver Meteor.
50th Anniversary Phase I unit leading a 6.5-hour late #8.
Amtrak 129 and 130 (Heritage) locomotives at Union Station