Done!         
The engineer is now done with the water uptake and leaves the hose stretched out for using later during the afternoon run. All told, it took about 10-15 minutes to refill the tender and be on our way again.
Date: 10/16/2012 Location: Durbin, WV   Map Show Durbin on a rail map Views: 56 Collection Of:   Gary Everhart
Author:  Gary Everhart
Done!
Picture Categories: Scenic,Action This picture is part of album:  The Durbin Rocket Takes on Water
Share
User Comments
Name Type Comments Date
Fred Stuckmann General Very cool. 11/16/2012 11:55:09 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3277785