Pneumatic line problems?  Contributor's Pick!       
The crew of this train spent about a half hour working on something between these two cars. I have to guess its the brake lines. It was a long time before this guy got underway.
Date: 9/27/2018 Location: Everett, WA   Map Show Everett on a rail map Views: 54 Collection Of:   Gregg Bartley
Author:  Gregg Bartley
Pneumatic line problems?
Picture Categories: Action This picture is part of album:  Interesting comings and goings, Everett WA
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5022961