CN 3149, CN 3151, CN 5738, CN 2507         
A CN through freight crosses Kampo Rd. as it heads northeast via a remnant of the former C&NW main line (now relegated to a passing siding) at Neenah, WI on 1 Jan. '19. The former SOO rails run parallel on this side of the train. Neenah Foundry Plant 2 & Plant 3 are partially visible in the background at left. Plant 2 opened in 1960 and Plant 3 was built in 1967. Plant 1 opened in 1918 and stood about a mile to the north, until it was closed in 1994 and eventually demolished.
Date: 1/1/2019 Location: Neenah, WI   Map Show Neenah on a rail map Views: 267 Collection Of:   T. P. Bruss
Locomotives: CN 3149(ET44AC) CN 3151(ET44AC) CN 5738(SD75I) CN 2507(C44-9WL)    Author:  T. P. Bruss
CN 3149, CN 3151, CN 5738, CN 2507
Picture Categories: This picture is part of album:  Northeast WI, Winter 2019
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5092670