AYPO passes some of the never ending construction on the Merrimack River Bridge          
Work started to rebuild the crumbling ex-B&M bridge a while back but is still ongoing and trains must still cross the bridge at restricted speed.
Date: 3/11/2021 Location: Haverhill, MA   Map Show Haverhill on a rail map Views: 63 Collection Of:   Jay Epstein
Locomotives: MEC 7585(C40-8) MEC 7534(C40-8)    Author:  Jay Epstein
AYPO passes some of the never ending construction on the Merrimack River Bridge
Picture Categories: Bridge,Action This picture is part of album:  Northside of Boston Railfanning
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5508752