A East Erie Commercial 85-Tonner.
EEC 21 and seven brand new UP locomotives for delivery.
EEC 21 brings two more brand new UP locomotives up to the "waiting line."
Stopped to uncouple from CN 2284.
Moving the two CN units into position.
Backing onto the track to drop off the CN units.
Moving onto the EEC-NS Interchange.
Moving out onto the interchange with NS to drop the two new @N units off.
MNCR 208 is moved into the plant for repairs.
MNCR 208 is moved into the plant for!repairs.
MNCW 208 is moved into the plant for repairs.
Backing up to get the MNCW unit and take it into the plant.
Being moved onto the EEC-NS Interchange by EEC 81 to await pickup.
Being moved onto the EEC-NS Interchange by EEC 81 to await pickup.
Being moved onto the E@C-NS Interchange by EEC 81 to await pickup. In the background, MNCW 208 can be seen. In a few moments EEC 21 would pick up the MNCW unit and move it into the plant for repairs.
Roster shot of EEC 21
A small EEC center-cab is on the NS-EEC transfer to pick up the GECX locomotives and take them to GE property.